← canibuildaduonmypropertyFAQ
City pre-approved floor plans

Start with a plan
cities already love.

These layouts are pre-approved by their city, with no plan-check queue and no back-and-forth. Pick a layout. We handle the rest: updated address, new Title 24 calcs, and stamped structural drawings.

Browse plansSchedule a free site visit
30 days
Permit approval
$0
Impact fees under 750 sq ft
24 hrs
Proposal after site visit
6 cities
Plans available now

The process

Four steps from idea to permit

01
Pick your plan
Browse city pre-approved layouts below. Filter by size or bedroom count.
02
Free site visit
We visit your property to confirm setbacks, utilities, and lot fit.
03
We redraw for your address
Our team updates Title 24, structural calcs, and site plan, permit-ready.
04
We pull the permit
We submit and manage the entire permit process. You watch your ADU get built.

Available layouts

Choose your floor plan

Studio

Living / KitchenBathBedroomPorch
Studio / 1-bed
460 sf
City of Sacramento
All-electric2022 CBCMirroring allowed
Est. rental income
$1,200–$1,600/mo
Permit timeline
30-day approval
Open LivingBathClosetFront Porch
Studio: Willow
460 sf
Sacramento County
Traditional styleFront porchFree
Est. rental income
$1,200–$1,600/mo
Permit timeline
30-day approval
Open PlanBathStorageEntry
Studio
400 sf
City of Fresno
3 elevation stylesSolar includedFree
Est. rental income
$1,100–$1,500/mo
Permit timeline
30-day approval
Open PlanBathEntry / Porch
Studio: Plan A
280 sf
City of Concord
Smallest footprint6 plans availableFree
Est. rental income
$1,000–$1,400/mo
Permit timeline
30-day approval

One Bedroom

Living / KitchenBedroomBathPorch
1-bedroom
550 sf
City of Fresno
3 elevation stylesSolar includedFree
Est. rental income
$1,400–$1,800/mo
Permit timeline
30-day approval

Two Bedroom

Most popular
2-bedroom: Modern Layout
748 sf
Typical 2 bedroom isometric interior layout
Modern interior layoutCustom design available
Est. rental income
$1,800–$2,200/mo
Permit timeline
Custom plan

Why pre-approved plans

Built-in advantages from day one

Skip the plan-check queue
Cities have already reviewed and stamped these plans. Your permit goes in the fast lane, with 30-day approvals vs. 6–12 months for custom designs.
💰
No impact fees under 750 sq ft
State law exempts ADUs under 750 sq ft from all impact fees, saving you $8,000–$15,000 compared to larger builds.
📐
We handle every modification
Your address, lot orientation, Title 24 energy calcs, and stamped structural drawings, all updated by our licensed team before submission.
🏗
Proposal within 24 hours
Choose a plan today, schedule a free site visit, and receive a full build proposal within 24 hours of our visit.
Important: Pre-approved plans are city-specific and cannot be modified as-is. When you build with us, we redraw the plan set with your property address, recalculate Title 24 energy compliance for your specific lot orientation, and obtain updated stamped structural calculations from a licensed engineer, all included in our proposal. A site plan showing ADU placement on your parcel is always required at permit submittal. Plans listed are sourced from public city programs; availability and requirements may change.

Ready to see what fits your backyard?

We'll check your lot, confirm which pre-approved plan fits best, and hand you a proposal within 24 hours. No pressure. No jargon.

Schedule a free site visit →
Licensed & Insured · CA CSL #993478 · Serving NorCal
FREE EXPERT ADVICE!
See What Your Property Can Build
FREE Consultation